Physical Address

304 North Cardinal St.
Dorchester Center, MA 02124

Boeing CEO Kelly Orberg ‘Get Proper’ should swear


Boeing CEO Kelly Orberg On Wednesday, Capitol Hill told MPs that the company will not increase production production until there is a stable production system.

Despite the years behind the production schedule, Orberg, which explains the progress of improving security standards in front of the Senate Trade Committee, Boeing said he was working to repair the reputation after a number of crises.

In January 2024, a new Boeing 737 Max 9 Door Plugu exploded over a period of time Alaska Airlines After the plane, the switch of the flight left without installing a Boeing device. After 2024 the Federal Aviation Administration, the production of 737 maximum production of 737 in the month in 38.

The missing door on a plane

Alaska Airlines Boeing 737-9 The door-sized section behind the Max, 10 minutes after 1282 flights, Portland, Oregon, on January 5, 2024, left for Ontario, California. (NTSB via Getty Images / Getty Images)

Boeing CEO ‘accepts serious misconceptions in recent years’

During a broad hearing, Ortberg, these delays have solved the Committee’s questions about negative results and may be for commercial operations.

However, Orberg – received Helm in August – the company said he would not be in a hurry. Customers said Boeing was delayed to the delivery of aircraft, “they know this right,” he said.

Ortberg said the company is still a “reach of a stable system” and that he was not a solid date when returning to “38 months.”

Speaking in the microphone, Boeing Kelly Orberg CEO

Boeing CEO Kelly Orberg, Wednesday, testify before the Senate Trade, Science and Transportation Committee in Washington. (McNAMEE / Getty Images / Getty Images Win

District Referee Boeing 737 Max sets of test history in the case of fraud

“I suspect that I will be a period of time this year,” Orberg said. “I hope this allows production rates or production stability, to go.”

“I have received 100% support from them to make it right. I will not push the plane and have additional issues,” he said, added that customers were stuck with Boeing.

When the company’s production system is stable, it will move in production. However, Orberg said Boeing did not think that the Boeing would reach a degree where the planes of the people are previously. ”

Still, “I think our customers understand what they work with us and want to succeed,” he said.

Boeing 737 Max Assembly

The Boeing 737 max plane is collected on June 25, 2024 in Renton in Washington. (Jennifer Buchanan / Pool Reuters / File Photo / Reuters Pictures)

Orberg Dave Calhoun was shot to replace and turn around Airplane production giant Prestigious crisis and financial tensions after a number of high-level accidents related to Jets.

The Secretary of Transport Sean Duffy, Boeing, who killed 346 people in 2018 and 2019, he lost his trust in the American people after the Door Fish and in 2018 and 2019, he said.

Get the fox work on the way by clicking here

Ticker Safety Last Change Change%
Ba Boeing Co. 168.57 +0.36

+ 0.21%

But the aircraft manufacturer Pause was caught last month By defeating US Air Force, other top aerospace companies, ie Lockheed Martin, defeating other top aerospace companies, Fighter chose aerospace giant to build and deliver the next set of Fighter Jets.

The sixth generation of air force, the rendering of F-47.

Graphic artist’s rendering will be built by the sixth generation warrior of the Air Force, F-47 by Boeing. (US Air Force Graphics / Fox News)

Fox work ‘Stephen Sorace contributed to this report.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *